- Hoists[10]
- Cranes[1]
- Construction Lifter[1]
- Winches[7]
- Pulleys[7]
- Hand Carts & Trolleys[7]
- Chains[10]
- Clamps[6]
- Material Handling Equipment Parts[1]
- Jacks[2]
- Car Jacks[1]
- Hooks[3]
- Other Hardware[6]
- Other Hand Tools[2]
- Forklifts[1]
- Contact Person : Ms. Yang Helen
- Company Name : Baoding Sanlong Crane & Hoist Machinary Co., Ltd.
- Tel : 86-0312-3052616
- Address : Hebei,Baoding,Room 903,Building 15, Fortune Plaza, NO.666,Baihua east road.
- Country/Region : China
- Zip : 071000
GCL Trolley
Monorail trolley contains hand pull trolley and hand push trolley, pull trolley is driven by hand chain, and hand push trolley driven by pushing the lifting loads. It runs freely at the bottom flange of I beam, and distance between wheel flange can be adjusted according to the track width of I beam. A manual hoist traveling block can be formed by putting the chain block hangs under the trolley.
Usage: The trolley runs at the bottom flange of I beam, it can become a bridge, single beam & arm crane when matched with chain blocks. Monorail trolley is widely used in factory, mine, wharf, storage and construction site, for installation of machines and load lifting occasion, especially suitable for nonelectrical operation.
Model | GCL0.5 | GCL1 | GCL1.5 | GCL2 | GCL3 | GCL5 | GCL10 | |
WLL (ton) | 0.5 | 1 | 1.5 | 2 | 3 | 5 | 10 | |
Proof load (kn) | 7.35 | 14.71 | 22.06 | 29.42 | 44.13 | 61.29 | 122.58 | |
radius of min curve it can pass through (m) | 0.9 | 1.0 | 1.0 | 1.1 | 1.3 | 1.4 | 1.7 | |
dimension (mm) | A | 242.5 | 245 | 279.5 | 279.5 | 344 | 402 | 362 |
B | 170 | 206 | 228 | 240 | 282 | 327 | 389 | |
C | 187 | 206 | 236 | 243 | 320 | 393 | 490 | |
H | 105 | 109 | 125 | 133 | 179 | 220 | 275 | |
F | 1.5-3 | |||||||
Track width (mm) national standard | 68-94 | 68-100 | 88-118 | 94-124 | 116-140 | 142-180 | 142-180 | |
N.W. (kg) | 11 .8 | 14.7 | 17.5 | 17.5 | 34.5 | 53 | 98 |
Note: Non-standard Lifting height trolley and large tonnage monorail trolley can be customized.
GCL Trolley